taxonID	type	description	language	source
03C578684F01FFECFF2CF9FA02EDF8B1.taxon	discussion	This species is widely distributed in the moist afro-montane forests of Ethiopia. The bark of this species is used to treat a certain type of cancer and is being heavily extracted elsewhere in Africa. But such use has not been in place in Ethiopia. On the other hand, the area, extent and quality of its habitats are continually declining. As a result, Prunus africana has been assessed as vulnerable.	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
03C578684F01FFECFF2CF9FA02EDF8B1.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
03C578684F00FFEDFF2CFDBD041DFBCA.taxon	discussion	This species is economically very important crop and has its wild populations in the moist afro-montane forests of Ethiopia. This species was assessed for inclusion in the IUCN red list of Threatened species in 20 1 8. It has been assessed as Endangered (EN) 6 under criteria A 3 b. The latter means population reduction projected inferred or suspected to be met in the future (up to a maximum of 1 00 years) based on an index of abundance for this species. Deforestation, climate change, diseases and pests are the major threats. The geographic extent of this species is given below.	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
03C578684F00FFEDFF2CFDBD041DFBCA.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
03C578684F7AFF97FF2CFE230273F9F0.taxon	discussion	This species was previously reported from UNESCO-MAB Kaffa Biosphere Reserve and Godare. Now it is also reported from Sheka Forest and has served as one of the triggering factors for a designation of this Forest as a Biosphere Reserve. Its habitats include forest edges, herbaceous vegetations surrounding pools inside forest, coffee plantation and modified forest habitats. This endemic species has an IUCN conservation category of Endangered (cf. below).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
03C578684F7AFF97FF2CFE230273F9F0.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F79FF94FEFEFB9F0517FBE5.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F79FF94FEFEFD6306A0FD41.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F79FF94FEFEFCE105E3FCC7.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F79FF94FEFEFC5F06C3FBA5.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F79FF94FEFEFC2006CCFC05.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F79FF94FEFEFBDE0510FB2A.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F79FF94FEFEFD230528FD01.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F79FF94FEFEFCA106D5FC87.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F79FF94FEFEFC0006CCFC64.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F79FF94FEFEFB1D0574FB6B.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F79FF94FEFEFB7D050BFB4B.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
03C578684F79FF95FF1CFA380471FBD5.taxon	discussion	This rodent species is endemic to Ethiopia. Figure 6 - 9 shows the species and its geographic range in Ethiopia. The species distribution ranges from Metu to Tepi and covers the project area as well. It habitats are humid afro-montane forest dominated by Ficus species and undergrowth dominated by coffee. Deforestation of the afro-montane forest may threaten this species in the future. This species has been assessed as vulnerable.	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
03C578684F79FF95FF1CFA380471FBD5.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
03C578684F78FF9AFF1CFA7A037AFADC.taxon	discussion	This bat species is endemic to the highlands of Ethiopia on both sides of the Ethiopian Rift Valley (see below). Its habitats are Afro-montane Forest and shrubland. Its populations are severely fragmented. Scott’s mouse- eared Bat was assessed as a Vulnerable species with regard to its conservation status. Habitat fragmentation and conversion are the major threat to the conservation of this species.	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
03C578684F78FF9AFF1CFA7A037AFADC.taxon	description	The elevation range of this species is 1 300 – 2500 masl in Ethiopia. Part of the project area (around Metu) falls in the geographic extent of this species (see below). But the remaining areas of the project are outside of the geographic range of this species.	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
03C578684F78FF9AFF1CFA7A037AFADC.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
03C578684F76FF9BFF2CFC5605BDFB08.taxon	discussion	This species has a wide geographic range even outside Ethiopia. Its superior quality of hardwoods has results in its high exploitation for timber. This species was assessed as Vulnerable. Generally, these four species (3 animal and 1 plant) are the biodiversity elements that have triggered the delineation of Sheka Forest as a UNESCO Biosphere Reserve of a global importance.	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
03C578684F76FF9BFF2CFC5605BDFB08.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23F9570664F8B3.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23F9CB065CF91F.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F72FF9FFF23F923067DF967.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6FFF82FF23F8A7061CF882.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FA500621F9BA.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23F9AE06E0F99A.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6FFF82FF23F9CD0626F938.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6FFF82FF23F92B063EF919.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6FFF82FF23FE3406F6FE16.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F72FF9FFF23FB870656FBC2.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F72FF9FFF23F961062CF8A5.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • Not assessed ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F72FF9FFF23FB240614FB61.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FAD506D8FAD0.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F72FF9FFF23F9C406E9F921.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23FCD106D4FCD7.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23FC30061EFC35.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FB1B066BFB4F.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23FC2F066AFC7A.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FBFE0609FBCA.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23F97806CEF94D.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F72FF9FFF23F8BF06D3F88A.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23FF590622FEAF.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23FC930632FC96.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23FCF206E4FCF7.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F72FF9FFF23FBA906D6FB9C.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FDCE064BFD18.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FD4A0789FC9C.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FC8806C7FCFD.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23F895060CF893.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23F8F406FBF8F1.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23FA9C06DFFAE8.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6FFF82FF23FB5F06EEFAA5.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FBDD0615FB2B.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FA330623FA16.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FA7106CDFA74.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FF5906ECFEAF.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23FE1306E1FE11.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6EFF83FF23FF590660FE8D.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23F8D306E2F8D6.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6FFF82FF23FE970617FEF3.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FEB806F9FE8D.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F72FF9FFF23FBC506E4FB20.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23F8A606E3F882.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FCE7064CFC23.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FC25064CFC61.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FBA10662FBEA.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FC63064CFBA7.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FB3C0608FB08.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6FFF82FF23FED50608FED0.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6FFF82FF23FE7206E8FE77.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6FFF82FF23FE50060DFE54.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23F98D0634F9D9.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23F885064EF8C0.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6FFF82FF23FF59064EFE8D.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23F9090661F95D.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FAB80659FAED.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FAF6061CFAF3.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23F947060AF8A2.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6EFF83FF23FED50621FED0.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23FEB806E7FE8D.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23FE970605FEED.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6FFF82FF23F90B06EEF97E.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6FFF82FF23FCD106F9FCD7.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F70FF9DFF23FE97064CFEF2.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6FFF82FF23F9690654F8BC.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6FFF82FF23F8860622F8E2.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23FEF60670FED0.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F71FF9CFF23FE3406FBFE30.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6EFF83FF23FE9706F3FEED.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6EFF83FF23FEF606EBFEF3.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6) • Not assessed ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F6CFF81FF23FE5A065CFD89.taxon	materials_examined	Not assessed ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F67FF8AFF23FBE906FBFBDF.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14F67FF8AFF23FB27063EFB62.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FC340555FC31.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3) • 1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (Table 6).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FEDB05DAFE2E.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FE2405FEFE01.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FE0C056CFE79.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FE540535FE50.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FDBD05EAFD8B.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FD8605C4FDE3.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FDEF056AFDDA.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FD3305D5FD31.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FD1F0587FD65.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FD68053BFD5C.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FCB10509FCB4.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FC9905A8FCEC.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FCE20543FCC7.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FCCA0559FC3F.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FC2F05DFFC15.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FC7B06C5FC4E.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FC430528FBA1.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FBAC054EFB98.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FBF505E4FBF0.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FBDD05FCFB28.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FB260571FB03.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FB5705B7FAAD.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FA88053BFAFD.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FAD1053BFAD4.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FE90069DFE95.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FEC10552FE24.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FBC3050BFB26.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FE2905E6FE1F.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FE720579FE76.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FE5E0569FDAB.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FDA705B9FD82.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FD8F0689FDF5.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FDD80681FD2C.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FD210508FD04.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FD090520FD7C.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FD520550FD57.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FCBA0576FC8E.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FC830544FCE1.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FCEB05DAFCDE.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FC1D0555FC68.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FC650514FC43.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FC4D06ABFBBB.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FB96068CFB93.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FBFF06B4FBCA.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FBC7068CFB22.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FB2F06A1FB15.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FB780528FB4C.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FB4105E2FAA4.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FAA9051AFA9C.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FAF205EEFAF7.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD9FF34FEF9FADA0596FA2E.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FE9005A0FE95.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FEF80696FECD.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FEDC054BFE28.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FE2906A2FE1F.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FE720572FE76.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FE5A050EFDAF.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FDA3056FFD86.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FD8C06ACFDF9.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FDD405A5FDD0.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FD3D0500FD0B.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FD050539FD60.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FD6E0694FD5B.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FCB705DAFCB2.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FC9F0555FCE5.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FC300411FC35.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FC1905A4FC6C.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FC610569FC44.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FC4906A3FBBF.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FB9206BCFB96.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FBF705BEFBCD.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FB2C0533FB19.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FB7405E2FB70.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FAA5057EFA80.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FA8E0522FAFB.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD8FF35FEF9FAD70559FAD2.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FE90057BFE95.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FEF80695FECD.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FEC106B1FE24.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FE29069CFE1F.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FE720556FE76.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FE5A057CFDAF.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FDA30680FD86.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FD8C051EFDF9.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FDD40528FDD0.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FD3905AEFD0F.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FD050468FD60.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FD6E0518FD5B.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FCB7058AFCB2.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FC9F0532FCE5.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FCE706DEFCDD.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FC30057DFC35.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FBFB053EFBCE.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FDAFF37FEF9FB0E0512FB7A.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FC19051EFC6C.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FC6106BFFC44.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FC4905B5FBBF.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FB9206C1FB96.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FBC30571FB26.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FB2C0573FB19.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FB7406C2FB70.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FB5D05D0FAAB.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FAA5056EFA83.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FA8D055BFAF8.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD7FF3AFEF9FAD60557FAD3.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
D4341DC14FD6FF3BFEF9FE9005E2FE95.taxon	materials_examined	1 ex.; Ethiopia, South West Ethiopia Region, Sheka; 2021 - 01 - 01 - 2021 - 12 - 31; (table 17.3).	en	GmbH, Gopa-International Energy Consultants, Iris Consult Plc, Ethiopia (2022): Electricity Network Reinforcement and Expansion Project (ENREP) Update the Environmental and Social Impact Assessment (ESIA) for LOT-I: Metu-Mesha 230 KV Single Circuit Transmission Line. World Bank (WB), DOI: 10.5281/zenodo.17261405
